Skip to content
SIH Buddyby Ganeev Singh
Dev
All problem statements
SIH26130Proceed with cautionacceptance 2/5

Efficiency in streamlining industrial approvals,compliance processes,and access to government support services

Government Of Maharashtra · Smart Automation · Software

MAITRI already exists, so you must be able to say precisely what yours adds — encode the real approval rules for one specific sector deeply, or this is a portal competing against a deployed state platform.

What it actually is

Setting up an industrial unit means chasing registrations, licences, no-objection certificates and inspections across many departments, with requirements that change by sector, location and project size. Applicants cannot even work out which approvals apply to them. The ask is a single intelligent system that figures out the checklist and drives the whole journey.

What to build

A guided approvals platform where an entrepreneur describes their proposed unit — sector, location, size, stage — and a regulatory knowledge engine generates the exact list of approvals, licences and clearances that apply with the documents each requires, then pre-validates uploaded documents before submission, reuses already-verified data across applications so nothing is submitted twice, coordinates parallel departmental workflows with service-level timers and escalation alerts, schedules a common inspection instead of separate visits per department, and surfaces the incentive schemes the unit qualifies for, all on one dashboard tracking applications, approvals, renewals and pending queries.

Smallest thing that wins the room

Enter a proposed textile unit's sector, location and size and watch the engine generate a customised eleven-approval checklist with document requirements per approval, then show two departments running in parallel on the timeline with one breaching its statutory timeline and escalating automatically.

How crowded this one gets

A guess, projected from the 2025 statements — the last year where both the submission counts and the winners were published.

Crowded450–500 teams expectedroughly 1 in 381–421 wins it

Quieter than 7% of the 226 · #211 of 226 by expected field · reaches the 500 cap

Heavily contested. The obvious build has already been done by twenty other teams.

Why: state governments drew the biggest crowds in 2025.

This is a guess, not a fact

Nobody has published 2026’s numbers yet. This is an analysed estimate from last year’s pattern, so please do not take it as the truth — check the live counter on the SIH portal before you decide anything. The range covers the middle half of likely outcomes, so one statement in two lands outside it. Entry closes at 500 ideas per statement, so no range goes past that — a statement that reaches the cap fills and shuts rather than drawing an unlimited crowd. The model reads only three things a team can see before choosing — software or hardware, the theme, and what kind of body posted it — and those explain about a quarter of the variation in last year’s field sizes (R² 0.25 on held-out statements). Trust the band more than the number, and the ordering more than either. It cannot see how good your idea is, which is the part that actually decides it.

The scores

The number is the shorthand. The line under it is the reason.

What you will be writing

  • Rules engine (json-logic / Drools) for approval applicability
  • Document validation and reuse with verified-data store
  • Camunda or state-machine parallel workflow
  • SLA timers with escalation
  • React applicant + official dashboards
  • Semantic matching of incentive scheme eligibility
  • Regulatory compliance
  • Ease of doing business
  • Government workflow

Prior art to read before you start

single-window approval orchestration · regulatory applicability determination · parallel departmental workflow tracking

Analysed by Claude Opus. Every score above is a judgment call with its reasoning attached — kindly cross-check this against the official statement on the SIH portal before your team commits to it.