Skip to content
SIH Buddyby Ganeev Singh
Dev
All problem statements
SIH26062Proceed with cautionacceptance 2/5

Integrated Polar Expedition Logistics and Asset Management System

Ministry of Earth Sciences (MoES) · Toys & Games · Software

An exciting setting wrapped around ordinary inventory software with no data behind it — if you take it, make the stowage sequencing and depletion-against-resupply forecasting genuinely clever, because otherwise this is a CRUD portal with penguins on the login page.

What it actually is

An Antarctic expedition has to be planned a year out, with every container of food, fuel, equipment and spare part loaded onto one ship in the right order, tracked to the station, and accounted for once there. Personnel movements and emergency plans sit alongside it. The ask is one platform covering all of that instead of the spreadsheets it runs on now.

What to build

A platform covering the five domains the statement names: expedition planning with a requirements build-up per station and season; cargo tracking following each consignment from indent through ship manifest and voyage to station receipt, with stowage order reflecting the fact that what is loaded last comes off first; station inventory with consumption rates and a projection of what runs out before the next resupply window; personnel movement tracking who is at which station across a season with rotation and medical clearance status; and an emergency response module holding the plan, the current roll call and the resources actually on site.

Smallest thing that wins the room

Raise an indent for a station, follow it onto a voyage manifest and into station inventory on arrival, then run the depletion projection and show one item running out six weeks before the next ship is due.

How crowded this one gets

A guess, projected from the 2025 statements — the last year where both the submission counts and the winners were published.

Quiet70–170 teams expectedroughly 1 in 61–141 wins it

Quieter than 77% of the 226 · #52 of 226 by expected field

Few teams are likely to go here. The best odds on the board come from statements like this.

Why: central ministry statements sat below the average.

This is a guess, not a fact

Nobody has published 2026’s numbers yet. This is an analysed estimate from last year’s pattern, so please do not take it as the truth — check the live counter on the SIH portal before you decide anything. The range covers the middle half of likely outcomes, so one statement in two lands outside it. Entry closes at 500 ideas per statement, so no range goes past that — a statement that reaches the cap fills and shuts rather than drawing an unlimited crowd. The model reads only three things a team can see before choosing — software or hardware, the theme, and what kind of body posted it — and those explain about a quarter of the variation in last year’s field sizes (R² 0.25 on held-out statements). Trust the band more than the number, and the ordering more than either. It cannot see how good your idea is, which is the part that actually decides it.

The scores

The number is the shorthand. The line under it is the reason.

What you will be writing

  • Django or NestJS multi-module logistics backend
  • consumption-rate depletion forecasting
  • QR or RFID consignment tracking
  • PostgreSQL manifest and stowage model
  • React planning and inventory dashboards
  • role-scoped personnel movement register
  • Expedition logistics
  • Inventory management
  • Polar station operations

Prior art to read before you start

cargo consignment tracking · inventory depletion forecasting against resupply · multi-domain operations platform

Analysed by Claude Opus. Every score above is a judgment call with its reasoning attached — kindly cross-check this against the official statement on the SIH portal before your team commits to it.